Sub consultants to Parsons Brinckerhoff International
Study to determine safety concept standards to be adopted for the integrated tunnel system from Panchiao to beyond Nankang. The standards proposed included twin and triple track spacing, line side walkways and staff safety clearances, emergency exit spacing, ventilation design and control, signs, pictograms, lighting and emergency station halts.
|
 
|
Specialist sub consultants to Dar Al Handasah
Pre-feasibility study for 350 miles of railway route including preliminary alignment, traction studies, signalling and costings.
|
 
|
Specialist sub consultant to the Maitre D'Oevre, W S Atkins
Establishment of original parameters for signalling, railway maintenance riding quality and braking efficiency. Reviewing detailed designs undertaken by other consultants.
|
 
|
Specialist consultants to the Frank Graham Group
A study of the engineering and operational factors involved in rebuilding the station and operating local trains. Stated intention surveys were conducted to identify demand and revenue potential.
|
 
|
Client: Overseas Development Administration
Study into the feasibility of introducing a train information and describer system into the Delhi region. Different technical solutions were considered and the cost effectiveness evaluated by calculating all economic costs (capital and recurrent) of each of the technical options and discounting the resulting streams to obtain present day values.
|
|